Completed Projects
|
Abstract Construction Company |
|
Dallas, Texas |
| |
|
Heights Baptist Church | Site Excavation | $16,400.00 | August 2002 |
|
Richardson, Texas | |
| |
|
Adolfson & Peterson, Inc. |
|
Carrollton, Texas |
| |
|
Callier Center | Site Excavation | $62,500.00 | January 2003 |
|
Richardson, Texas | |
| |
|
Wayne Allen Construction |
|
Denton, Texas |
| |
|
Teasley Lane Office Building | Site | $20,000.00 | August 2001 |
|
Denton, Texas | Excavation |
| |
|
Andres Construction Services |
|
Dallas, Texas |
| |
|
University of Dallas | Site | $25,000.00 | May 2000 |
|
Irving, Texas | Excavation |
| |
|
Associate Construction Service, Inc. |
|
Bristol, Tennessee |
| |
|
Long John Silvers/A&W | Site Excavation | $24,600.00 | September 2002 |
|
Irving, Texas | |
| |
|
Atkinson & Associates Builders |
|
Edna, Texas |
| |
|
Whataburger | Site Excavation | $41,000.00 | August 2000 |
|
Garland, Texas | Lime Stabilization |
| |
|
Azteca Enterprises, Inc. |
|
Dallas, Texas |
| |
|
GSE Building Demolition | Site Excavation | $189,000.00 | January 2002 |
|
DFW Airport, Texas | Demolition |
| |
|
G.L. Barron Company |
|
Fort Worth, Texas |
| |
|
House of Grace | Site Excavation | $92,600.00 | November 2002 |
|
North Richland Hills, Texas | |
| |
|
HC Beck, Ltd. |
|
Dallas, Texas |
| |
|
Bowman Middle School | Site Excavation | $85,000.00 | June 2002 |
|
Plano, Texas | Lime Stabilization |
| |
|
Berry Construction Company |
|
Grand Prairie, Texas |
| |
|
Dollar General Store | Site | $40,000.00 | April 2001 |
|
Grand Prairie, Texas | Excavation |
| |
|
Blues Company General Contractors |
|
Roanoke, Texas |
| |
|
2415 Laurel Valley | Site | $10,000.00 | June 2000 |
|
Arlington, Texas | Excavation |
| |
|
Highway 26 @ Hall Johnson | Site | $5,000.00 | July 2000 |
|
Colleyville, Texas | Excavation |
|
|
Bollenback Builders, Inc. |
|
Oldsmar, Florida |
| |
|
Hertz Equipment Rental | Site | $59,000.00 | July 2001 |
|
Dallas, Texas | Excavation |
| |
|
Botanical Technologies |
|
Dallas, Texas |
| |
|
Kaufman Community Park | Lime | $45,000.00 | October 2001 |
|
Kaufman, Texas | Stabilization |
| |
|
Buford - Thompson Company |
|
Arlington, Texas |
| |
|
Carroll I.S.D. Elementary #5 | Site Excavation | $186,000.00 | August 2001 |
|
Southlake, Texas | Lime Stabilization |
| |
|
Cadence - McShane Corporation |
|
Dallas, Texas |
| |
|
Highland Park High School | Site | $60,000.00 | August 2000 |
|
Highland Park, Texas | Excavation |
| |
|
Highland Park H.S. - Phase II | Site | $40,000.00 | July 2001 |
|
Highland Park, Texas | Excavation |
| |
|
| |
Centerport Construction Services, Inc. |
|
Carrollton, Texas |
| |
|
Frisco EZ Storage | Site Excavation | $156,000.00 | June 2002 |
|
Frisco, Texas | Lime Stabilization |
| |
|
Citadel Construction and Design |
|
Dallas, Texas |
| |
|
Office Depot | Site | $72,000.00 | October 2001 |
|
Carrollton, Texas | Excavation |
| |
|
Clark Partnership |
|
Euless, Texas |
| |
|
LaBatt Foods Expansion | Site Excavation | $163,000.00 | October 2001 |
|
Dallas, Texas | Lime Stabilization |
|
CMPA, Inc. |
|
Grapevine, Texas |
| |
|
Harbourtown Villas | Site | $6,000.00 | July 2000 |
|
Lake Dallas, Texas | Excavation |
| |
|
Harbourtown Villas, Phase II | Site | $6,000.00 | August 2000 |
|
Lake Dallas, Texas | Excavation |
| |
|
Shady Oaks Centre | Site Excavation | $75,000.00 | February 2001 |
|
Southlake, Texas | Lime Stabilization |
| |
|
Component Construction Company |
|
Fort Worth, Texas |
| |
|
Grand Prairie Service Center | Site Excavation | $68,000.00 | December 2001 |
|
Grand Prarie, Texas | Lime Stabilization |
| |
|
DalMac Construction |
|
Richardson, Texas |
| |
|
Lewisville ISD Athletic Office | Site | $15,000.00 | February 2001 |
|
Lewisville, Texas | Excavation |
| |
|
Fannin Elementary School | Site | $75,000.00 | June 2001 |
|
Grand Prairie, Texas | Excavation |
| |
|
Skyview Elementary | Site | $31,000.00 | June 2001 |
|
Dallas, Texas | Excavation |
| |
|
Lee Middle School | Site | $36,000.00 | August 2001 |
|
Grand Prairie, Texas | Excavation |
| |
|
Austin Elementary School | Site | $132,000.00 | August 2001 |
|
Grand Prairie, Texas | Excavation |
| |
|
Autistic Center of Dallas | Site Excavation | $72,000.00 | November 2001 |
|
Dallas, Texas | Lime Stabilization |
| |
|
The Colony H.S. Additions | Site Excavation | $52,000.00 | December 2001 |
|
The Colony, Texas | Lime Stabilization |
| |
|
White Rock Elementary | Site Excavation | $24,000.00 | January 2002 |
|
Dallas, Texas | |
| |
|
Indian Creek Elementary | Site Excavation | $36,000.00 | June 2002 |
|
Carrollton, Texas | |
| |
|
Diversified Construction Services, Inc. |
|
Frisco, Texas |
| |
|
Four Middle School Gyms | Site Excavation | $105,000.00 | August 2002 |
|
Plano, Texas | |
| |
|
Highlands Elementary School | Site Excavation | $105,000.00 | September 2002 |
|
Cedar Hill, Texas | Lime Stabilization |
| |
|
High Pointe Elementary School | Site Excavation | $85,000.00 | September 2002 |
|
Cedar Hill, Texas | Lime Stabilization |
| |
|
Waterford Oaks Elementary | Site Excavation | $45,000.00 | August 2002 |
|
Cedar Hill, Texas | Lime Stabilization |
| |
|
Dooley and Mack |
|
Lewisville, Texas |
| |
|
CVS Pharmacy | Site Excavation | $40,600.00 | June 2002 |
|
Dallas, Texas | |
| |
|
DPR Construction, Inc. |
|
Plano, Texas |
| |
|
Washington Mutual Bank | Site | $20,000.00 | July 2001 |
|
Frisco, Texas | Excavation |
|
Eagle Constructors |
|
Lancaster, Texas |
| |
|
Ferris Grade School | Lime | $29,000.00 | February 2002 |
|
Ferris, Texas | Stabilization |
| |
|
Midlothian Power Plant | Lime | $8,000.00 | February 2002 |
|
Midlothian, Texas | Stabilization |
| |
|
Cedar Hill High School | Lime Stabilization | $2,650.00 | July 2002 |
|
Cedar Hill, Texas | |
|
Guaranty Bank | Lime Stabilization | $7,950.00 | July 2002 |
|
Waxahachie, Texas | |
| |
|
Embree Construction Group, Inc. |
|
Georgetown, Texas |
| |
|
Applebee | Site Excavation | $52,000.00 | August 2002 |
|
Burleson, Texas | |
| |
|
Gallagher Construction Management |
|
Plano, Texas |
| |
|
Wylie Fine Arts & Athletic Bldg. | Site Excavation | $69,300.00 | June 2002 |
|
Wylie, Texas | |
| |
|
Wylie Transportation Center | Site Excavation | $105,000.00 | August 2002 |
|
Wylie, Texas | |
| |
|
Harrison, Walker & Harper, LP |
|
Paris, Texas |
| |
|
Ennis 6th Grade Center | Site Excavation | $169,000.00 | November 2002 |
|
Ennis, Texas | Lime Stabilization |
| |
|
Ennis Early Childhood Center | Site Excavation | $66,000.00 | November 2002 |
|
Ennis, Texas | Lime Stabilization |
| |
|
Posper Elementary | Site Excavation | $42,877.00 | September 2002 |
|
Prosper, Texas | Lime Stabilization |
| |
|
Prosper Gym Addition | Site Excavation | $14,000.00 | December 2002 |
|
Prosper, Texas | |
| |
|
Ponder HS Parking Lot | Site Excavation | $32,600.00 | November 2002 |
|
Ponder, Texas | |
| |
|
Hisaw and Associates |
|
Carrollton, Texas |
| |
|
Dave Blair Intermediate School | Site Excavation | $139,000.00 | January 2002 |
|
Farmers Branch, Texas | Lime Stabilization |
| |
|
ICI Construction, Inc. |
|
Dallas, Texas |
| |
|
Billiards & Barstools | Site Excavation | $43,000.00 | June 2002 |
|
Frisco, Texas | |
| |
|
Idea Construction |
|
Dallas, Texas |
| |
|
Preston Charles Place Bldg. 3 | Site | $38,000.00 | November 2001 |
|
Plano, Texas | Excavation |
| |
|
JV Commercial, Inc, |
|
Lewisville, Texas |
| |
|
Mckinney Sr. Center Pool | Site Excavation | $23,871.00 | October 2002 |
|
Plano, Texas | |
| |
|
W. B. Kibler |
|
Dallas, Texas |
| |
|
Coit Crossing Retail Center | Site | $116,000.00 | April 2001 |
|
Plano, Texas | Excavation |
| |
|
Grace Community Church | Site Excavation | $196,000.00 | November 2001 |
|
Plano, Texas | Lime Stabilization |
| |
|
Koster Construction Company, Inc. |
|
Irving, Texas |
| |
|
Comfort Suites | Site | $33,000.00 | August 2001 |
|
McKinney, Texas | Excavation |
| |
|
Courtyard by Marriott | Site | $59,000.00 | October 2001 |
|
Irving, Texas | Excavation |
| |
|
Leetex, Incorporated |
|
Dallas, Texas |
| |
|
Albertsons Express | Site | $12,000.00 | May 2002 |
|
Dallas, Texas | Excavation |
| |
|
Albertsons Store | Site | $427,000.00 | May 2002 |
|
Dallas, Texas | Excavation |
|
Linbeck Construction Corporation |
|
Fort Worth, Texas |
| |
|
TCU - Waits Hall | Site | $54,000.00 | May 2001 |
|
Fort Worth, Texas | Excavation |
| |
|
Scott Lucas Construction, Inc. |
|
Richardson, Texas |
| |
|
Rowlette Community Park | Lime Stabilization | $18,222.00 | July 2002 |
|
Rowlette, Texas | |
| |
|
Mapp Contruction, Inc. |
|
Dallas, Texas |
| |
|
Arlington Tech Center | Site Excavation | $79,500.00 | August 2002 |
|
Dallas, Texas | |
| |
|
Richland Point Retaining Wall | Site Excavation | $18,450.00 | September 2002 |
|
North Richland Hills, Texas | |
| |
|
Mart,Inc. |
|
Irving, Texas |
| |
|
Dallas Lamp | Lime Stabilization | $7,000.00 | November 2002 |
|
Irving, Texas | |
| |
|
Garland Fire station #4 | Lime Stabilization | $10,000.00 | October 2002 |
|
Garland, Texas | |
| |
|
MDI General Contractors,Inc. |
|
Irving, Texas |
| |
|
Holy Family of the Nazareth | Site Excavation | $9,900.00 | November 2002 |
|
Irving, Texas | |
| |
|
Medco Construction |
|
Dallas, Texas |
| |
|
Baylor Hospital Parking Lot | Site | $28,000.00 | December 2001 |
|
Dallas, Texas | Excavation |
| |
|
Baylor Medical Office Building | Site Excavation | $151,000.00 | January 2003 |
|
Garland, Texas | |
| |
|
Meridian Commercial, Inc. |
|
Dallas, Texas |
| |
|
Payless Rental Cars EUA | Site Excavation | $41,000.00 | November 2000 |
|
DFW Airport, Texas | Lime Stabilization |
| |
|
EZ Rental Cars EUA | Site Excavation | $35,000.00 | December 2000 |
|
DFW Airport, Texas | Lime Stabilization |
| |
|
Regency Lincoln - Mercury | Site | $111,000.00 | October 2001 |
|
Mesquite, Texas | Excavation |
| |
|
Modern Contractors |
|
Fort Worth, Texas |
| |
|
Hi Point Ag Barn | Site Excavation | $26,200.00 | January 2003 |
|
Plano, Texas | |
| |
|
Bob Moore Construction, Inc. |
|
Arlington, Texas |
| |
|
Parkway Business Center | Site | $170,000.00 | June 2001 |
|
Arlington, Texas | Excavation |
| |
|
Harley Davidson of Corinth | Site Excavation | $68,000.00 | June 2002 |
|
Dallas, Texas | |
| |
|
Mycon General Contractors |
|
McKinney, Texas |
| |
|
Park Place Center | Site | $132,000.00 | April 2001 |
|
Plano, Texas | Excavation |
| |
|
Community Credit Union | Site | $32,000.00 | April 2001 |
|
Plano, Texas | Excavation |
| |
|
Oakmont Country Club | Site | $63,000.00 | May 2001 |
|
Corinth, Texas | Excavation |
| |
|
Norstar Group |
|
Toronto, Ontario |
| |
|
Silver Creek Apartments | Site | $120,000.00 | December 2001 |
|
North Richland Hills, Texas | Excavation |
| |
|
Pacific Builders, Inc. |
|
Carrollton, Texas |
| |
|
Stemmons Cornerstone Crossing | Site Excavation | $133,000.00 | June 2002 |
|
Dallas, Texas | |
| |
|
Paric Corporation |
|
Arlington, Texas |
| |
|
UTA Village Apartments West | Site Excavation | $136,000.00 | November 2002 |
|
Arlington, Texas | Lime Stabilization |
| |
|
Parkway Construction Company |
|
Lewisville, Texas |
| |
|
Chuck E. Cheese | Site Excavation | $75,000.00 | April 2001 |
|
Rockwall, Texas | Lime Stabilization |
| |
|
Patco Contracting, Inc. |
|
Mansfield, Texas |
| |
|
Ralston Outdoors | Site Excavation | $18,600.00 | November 2002 |
|
Lewisville, Texas | |
| |
|
Pogue, Inc. |
|
McKinney, Texas |
| |
|
Fellowship Bible Church | Site | $31,000.00 | January 2002 |
|
Dallas, Texas | Excavation |
| |
|
Burks Elementary | Site | $19,800.00 | November 2002 |
|
McKinney, Texas | Excavation |
| |
|
Slaughter Elementary | Site Excavation | $31,000.00 | November 2002 |
|
McKinney, Texas | Lime Stabilization |
| |
|
Precept Builders |
|
Dallas, Texas |
| |
|
Irving Bible Church | Site Excavation | $270,000.00 | November 2002 |
|
Irving, Texas | Lime Stabilization |
| |
|
St. Joseph's Catholic Church | Site | $207,000.00 | November 2002 |
|
Richardson, Texas | Excavation |
| |
|
Rafael Construction |
|
Las Vegas, Nevada |
| |
|
Children’s Choice | Site | $140,000.00 | November 2001 |
|
Dallas, Texas | Excavation |
| |
|
Ratcliff Constructors |
|
Dallas, Texas |
| |
|
Homesteps | Site | $48,000.00 | July 2001 |
|
Carrollton, Texas | Excavation |
| |
|
Town West Elementary | Site Excavation | $89,000.00 | June 2002 |
|
Plano, Texas | Lime Stabilization |
| |
|
El Dorado Elementary | Site Excavation | $92,000.00 | June 2002 |
|
Plano, Texas | Lime Stabilization |
| |
|
Rawlins Construction, Inc. |
|
Richardson, Texas |
| |
|
CVS Pharmacy | Site | $49,800.00 | July 2002 |
|
Plano, Texas | Excavation |
| |
|
CVS Pharmacy | Site | $55,380.00 | November 2002 |
|
Garland, Texas | Excavation |
| |
|
Raymond Construction, Inc. |
|
Dallas, Texas |
| |
|
Cobra Caps South | Site | $514,000.00 | May 2002 |
|
Dallas, Texas | Excavation |
| |
|
C. R. Reynolds, Inc. |
|
Sherman, Texas |
| |
|
Frank Moates Elementary | Site Excavation | $48,000.00 | February 2001 |
|
Glenn Heights, Texas | Lime Stabilization |
| |
|
DeSoto High School | Site Excavation | $29,000.00 | February 2001 |
|
DeSoto, Texas | Lime Stabilization |
| |
|
Allen Firestation | Site | $7,200.00 | May 2002 |
|
Allen, Texas | Excavation |
| |
|
Royal Seal Construction, Inc. |
|
Flower Mound, TX |
| |
|
Racetrac | Site | $102,898.00 | May 2002 |
|
Burleson, Texas | Excavation |
| |
|
Shurgard, Inc. |
|
Seattle, Washington |
| |
|
Shurgard of Grapevine Hwy. | Channel | $40,000.00 | September 2000 |
|
Hurst, Texas | Excavation |
| |
|
Southlake Commercial General Contractors |
|
Dallas, Texas |
| |
|
Pieter Andries Jewelry | Site Excavation | $52,000.00 | June 2000 |
|
Southlake, Texas | Lime Stabilization |
| |
|
K. A. Sparks Contractor, Inc. |
|
Hamilton, Texas |
| |
|
Forestwood Middle School | Site | $23,000.00 | July 2000 |
|
Flower Mound, Texas | Excavation |
| |
|
Flower Mound Elementary | Site | $33,000.00 | July 2000 |
|
Flower Mound, Texas | Excavation |
| |
|
Coppell ISD Administration | Site | $19,000.00 | August 2000 |
|
Coppell, Texas | Excavation |
| |
|
Coppell ISD Softball Fields | Site Excavation | $116,000.00 | May 2001 |
|
Coppell, Texas | Lime Stabilization |
| |
|
Flower Mound H.S. Auditorium | Site | $41,000.00 | June 2001 |
|
Flower Mound, Texas | Excavation |
| |
|
Hebron H.S. Auditorium | Site | $45,000.00 | June 2001 |
|
Carrollton, Texas | Excavation |
| |
|
Hebron HS Class & Field House | Site Excavation | $230,000.00 | February 2002 |
|
Carrollton, Texas | Lime Stabilization |
| |
|
Coppell Service Center | Site Excavation | $145,000.00 | September 2002 |
|
Coppell, Texas | Lime Stabilization |
| |
|
Spring Valley Construction Company |
|
Dallas, Texas |
| |
|
Las Colinas Federal Credit Union | Site Excavation | $33,000.00 | September 2000 |
|
Irving, Texas | Lime Stabilization |
| |
|
Lantana Maintenance Center | Site | $74,000.00 | June 2001 |
|
Denton County, Texas | Excavation |
| |
|
Lantana Amenities Center | Site | $152,000.00 | September 2001 |
|
Denton County, Texas | Excavation |
| |
|
Lantana Golf Clubhouse | Site | $186,000.00 | January 2002 |
|
Denton County, Texas | Excavation |
| |
|
Starling Richardson Construction, Inc. |
|
Richardson, Texas |
| |
|
Meadows Baptist Church | Site Excavation | $120,000.00 | December 2001 |
|
Plano, Texas | Lime Stabilization |
| |
|
Stonebridge Builders |
|
Haltom City, Texas |
| |
|
Tony's Lube Center | Site | $20,956.00 | April 2002 |
|
Watauga, Texas | Excavation |
| |
|
Stovall Construction, Inc. |
|
Arlington, Texas |
| |
|
KFC/A&W | Site | $22,300.00 | July 2002 |
|
Dallas, Texas | Excavation |
| |
|
Mcdonalds | Site | $38,600.00 | July 2002 |
|
Dallas, Texas | Excavation |
| |
|
Mcdonalds | Site | $35,600.00 | August 2002 |
|
Alvarado, Texas | Excavation |
| |
|
TAB Construction |
|
Carrollton, Texas |
| |
|
Bank One | Site | $27,000.00 | March 2002 |
|
Fort Worth, Texas | Excavation |
| |
|
Turner Construction Co. |
|
Dallas, Texas |
| |
|
Pioneer Middle School | Site Excavation | $440,000.00 | November 2002 |
|
Frisco, Texas | Lime Stabilization |
| |
|
Wester Middle School | Site Excavation | $660,000.00 | November 2002 |
|
Frisco, Texas | Excavation |
| |
|
Twin Oaks Development, Inc. |
|
Genisus | Site Excavation | $179,500.00 | January 2003 |
|
Dallas, Texas | Excavation |
| |
|
Dallas, Texas |
| |
|
Hurst Highway 26, Ltd. | Site | $53,000.00 | October 2000 |
|
Hurst, Texas | Excavation |
| |
|
Alan Utz & Associates, Inc. |
|
Tyler, Texas |
| |
|
Eckerd Drug Store | Site Excavation | $60,000.00 | September 2000 |
|
Dallas, Texas | Lime Stabilization |
| |
| |
|
7-11 | Site | $28,000.00 | May 2001 |
|
Plano, Texas | Excavation |
| |
|
7-11 | Site | $30,000.00 | May 2001 |
|
Roanoke, Texas | Excavation |
| |
|
Eckerd Drug Store | Site | $12,000.00 | May 2001 |
|
Frisco, Texas | Excavation |
| |
|
Vista Builders |
|
Coppell, Texas |
| |
|
Bennigan's | Site | $45,000.00 | November 2000 |
|
Cedar Hill, Texas | Excavation |
| |
|
C. A. Walker Construction |
|
Houston, Texas |
| |
|
Washington Mutual Bank | Site Excavation | $15,000.00 | October 2001 |
|
McKinney, Texas | Lime Stabilization |
| |
|
Westport Group, Inc. |
|
Austin, Texas |
| |
|
Firestone Tire Store | Site Excavation | $46,000.00 | March 2001 |
|
Frisco, Texas | Lime Stabilization |
| |
|
White-Spunner Construction, Inc. |
|
Mobile, Alabama |
| |
|
Home Depot | Site | $380,000.00 | August 2002 |
|
Dallas, Texas | Excavation |
| |
|
Home Depot | Site Excav/Demolition | $434,000.00 | Match 2002 |
|
Greenville, Texas | Lime Stabilization |
| |
|
Wilson Barnes General Contractors |
|
Dallas, Texas |
| |
|
McDonalds | Site | $13,000.00 | October 2000 |
|
Dallas, Texas | Excavation |
| |
|
McDonalds #2 | Site | $25,000.00 | December 2000 |
|
Dallas, Texas | Excavation |
| |
|
Olive Garden Restaurant | Site Excavation | $82,000.00 | February 2001 |
|
Frisco, Texas | Lime Stabilization |
| |
|
Posados Restaurant | Site | $28,000.00 | May 2001 |
|
Frisco, Texas | Excavation |
| |
|
T.J. Hartford’s Restaurant | Site Excavation | $86,000.00 | May 2001 |
|
Lewisville, Texas | Lime Stabilization |
| |
|
Roy’s Restaurant | Site | $40,000.00 | October 2001 |
|
Plano, Texas | Excavation |
| |
|
Men’s Warehouse | Site | $7,000.00 | October 2001 |
|
Cedar Hill, Texas | Excavation |
| |
|
Joe's CrabShack | Site | $60,000.00 | September 2002 |
|
Fort Worth, Texas | Excavation |
| |
|
Macaroni Grill | Site | $32,600.00 | September 2002 |
|
Mesquite, Texas | Excavation |
| |
|
Big Bowl | Site Excavation | $27,400.00 | January 2003 |
|
Lewisville, Texas | Lime Stabilization |
| |
|
Wright Construction Company |
|
Grapevine, Texas |
| |
|
Carroll Avenue Widening | Roadway | $41,000.00 | May 2001 |
|
Southlake, Texas | Excavation |
|
|
|